US Patents Created by Dr. Simon Tseytlin1) Method and Devices for Maximizing Oil Production from Wells Containing Oil with High Gas-to-Oil Ratio and Oil Extraction from Oil Rims of Gas Reservoirs (US Patent 11,002,109 B1) 8) Method and Device for Production of Hydrocarbon (US Patent 5,752,570) 9) Method and Device for Production of Hydrocarbon (US Patent 5,967,234) 10) Method and Device for Production of Hydrocarbon (US Patent 6,173,784) |
Publications by Dr. Simon Tseytlin1) An Efficient Method for Enhanced Oil Produciton Providing an Increase in Oil Recovery Index (Society of Petroleum Engineers, SPE 51097, Nov. 1998 2) Successful Application of a New Oil Production Optimization System at the Kokdumalak Field in Uzbekistan (AAPG March 10-13 2002) 3) EM MWD Technology Enhances UNderbalanced Drilling Efficiency in Mexico (OMC 2011) 4) A Method and an Apparatus for Killing an Uncontrolled Oil-Gas Fountain at an Offshore Oil Platform Using a Telescopic Rod Assembly (SPE 166870) 5) Methods and Devices for Determination of Gas Kick Parameters and Prevention of Well Explosion (SPE 166871) 6) Calculation of the Non-Stationary Temperature Field in a Two-Layer Plate When Heated by a Moving Source in the Presence of Inhomogeneties on the Contact Surface of the Layers (Journal of Engineering Physics Vol.31 No.4 pp.1223-1226, 1976) 7) Numerical Solution of a Two-Dimensional Problem of the Transient Hydrodynamics of a Compressible Non-Newtonian Fluid (Journal of Engineering Physics Vol.40, No.4 pp.398-405, 1981) 8) Unsteady Two-Dimensional Flow of a Compressible Non-Newtonian Fluid in a Long Annular Channel Caused by the Motion of an Inside Pipe (Journal of Engineering Physics Vol.49, No.2, pp.917-922, 1985) 9) Propagation of Compression Waves in a Long Vertical Channel Containing a Gasified Packet (Journal of Engineering Physics Vol.58, No.1, pp.14-20, 1990) 10) Numerical Study of the Problem of Unsteady Heat Transfer in a Cased-Well-Bed System (Journal of Engineering Physics Vol.60 No.5 pp.645-650, 1991) 11) Effect of Oil Degassing in a Bed on the Progress of Hydrodynamic Processes in a "Connecting Pipe-Well-Bed" System (Journal of Engineering Physics Vol.63 No.1 pp.651-657, 1992) 12) A Numerical Solution of a Problem in the Theory of Induction Logging by the Method of Transition Process (Physics of the Solid Earth, No.6, pp.383-387, 1976) 13) Numeric Solution of Normal Problem of Lateral and Induction Logging Theory (Physics of the Solid Earth, No.9, pp.651-656, 1979) 14) Borehole Influence of Natural Heat Field (Physics of the Solid Earth, No.8, pp.771-777, 1990) 15) Theory of Differential Method of Well Barometry (Soviet Geology and Geophysics, No.8, pp.108-111, 1989) 16) A Comparative Rating of the Revealability of Discontinuity-Type Defects With Various Cycles and Method of Active Thermal Inspection (Soviet Journal of Non-Destructive Testing, No.9, pp.804-810, 1978) 17) Theoretical Analysis of Heat Transfer in a Coaxial-Type Electric Heater (Soviet Surface Engineering and Applied Electrochemistry, No.10, pp.37-43, 1985) |
Monographies by Dr. Simon Tseytlin3) The Library of High-Precision Simulators. On the Origin of Earth and Planets Magnetic Fields. 4) Collection of Articles by Dr.S.D.Tseytlin (in Russian) 6) Processes Occurring in the Well-Formation System During Geophysical, Drilling and Production Works. |